代写 SSUD 71-308 Project Contract Administration

  • 100%原创包过,高质量代写&免费提供Turnitin报告--24小时客服QQ&微信:273427
  • SSUD 71-308
    Project Contract Administration
    Assignment 2
    Due: Week 11
    Friday 1 April 2015 by 4pm
    Assignments must be submitted using the iLearn Portal for this
    subject.
    A hard copy hand in is not necessary.
    SSUD71-308 Project Contract Administration  Assignment 2
    1
    Assignment 2
    Guidelines
    Due date: To be received no later than 4:00pm, Friday 1 April 2016 (end of Week 11).
    Hand-In:  Hand in by the due date through the iLearn subject portal.
    Notes on plagiarism:
    Whilst we expect a great deal of quoting from the contract which will show
    up on Turnitin, we do not want copying from other student’s work. The first
    type of copying is expected and encouraged. The second is not permitted and
    could result in marks being deducted or the assignment being rejected.
    Answer: All five questions must be answered.
    Use MW-1 and AS 4000 citing clauses where necessary.
    Select one of the contracts being studied and answer all questions in terms
    of that contract. You do NOT need to answer the questions using both
    contracts. Note the contract you have chosen in the answer. You may switch
    contracts between answers if this suits you.
    Marking:  25% of subject assessment.
    All questions are of equal weighting (5 x 5%).
    Format: All Questions are brief essays (half a page or not more than one page in
    length). You should be focused on giving the facts clearly and concisely.
    Be sure to describe clearly the issue requiring attention and to cite:
    * the contractual basis for your comments and answer;
    * quote relevant contract clauses to support your statements/comments;
    * the time frame within which an action must be taken in response; and
    * the consequences of failure to take such action.
    Length: No greater than is absolutely necessary to convey the intended message in
    accordance with the requirements of the contract.
    Comments: All the Questions are generally based on the Topics 5-9 in Goldfayl.
    Reference to the contracts and to the prescribed text are encouraged.
    Assignment 2  SSUD12-308 Project Contract Administration
    Question 2.1 (5%)
    a. Define a variation under the contract.
    b. Why do we need variations in a lump sum building contract?
    c. Who can authorise variations?
    Question 2.2 (5%)
    Using your selected contract trace the steps (in dot-point form, flowcharts or brief
    descriptions) to notify, submit, assess and resolve a dispute involving a time extension
    claim that involves concurrent delays.
    Question 2.3 (5%)
    a. Describe the costs and expenses caused by delay and disruption
    b. Explain how these costs can be recovered by the contractor.
    Question 2.4 (5%)
    Using your selected contract trace the steps (in dot-point form, flowcharts or brief
    descriptions) involved in preparing a regular progress claim and which identifies the
    parties involved and the time scale for making such a progress payment claim.
    Question 2.5 (5%)
    Using your selected contract trace the steps (in dot-point form, flowcharts or brief
    descriptions) involved in the procedure for making administering a routine Practical
    Completion notice by the contractor.